1.            Crude oil production during June, 2017 was 2984.50 TMT which is 2.13% lower than target but 0.60% higher when compared with June 2016. Cumulative crude oil production during April-June, 2017 was 9022.37 TMT which is 1.49% lower than target for the period but 0.24% higher than production during corresponding period of last year. Unit-wise and state-wise crude oil production is given at Annexure-I. Unit-wise crude oil production for the month of June, 2017 and cumulatively for the period April-June, 2017 vis-à-vis same period of last year has been shown in Table-1 and month-wise in Figure-1.
Table-1: Crude Oil Production (in TMT)
Oil Company
Target
June (Month)
April-June (Cumulative)
2017-18 (Apr-Mar)
2017-18
2016-17
% over last year
2017-18
2016-17
% over last year
Target
Prod.*
Prod.
Target
Prod.*
Prod.
ONGC
23071.00
1891.49
1859.48
1803.06
103.13
5652.99
5640.77
5492.14
102.71
OIL
3734.00
284.47
278.71
265.37
105.03
856.22
839.86
798.18
105.22
PSC Fields
10562.00
873.55
846.32
898.19
94.22
2649.78
2541.74
2710.69
93.77
Total
37367.00
3049.51
2984.50
2966.61
100.60
9158.99
9022.37
9001.01
100.24
Note: Totals may not tally due to rounding off.                                       *: Provisional



Figure-1: Monthly Crude Oil Production
Unit-wise production details with reasons for shortfall have been given in following sub-sections:

1.1        Crude oil production by ONGC during June, 2017 was 1859.48 TMT which is 1.69% lower than the monthly target but 3.13% higher when compared with June, 2016. Cumulative crude oil production by ONGC during April-June, 2017 was 5640.77 TMT which is 0.22% lower than target for the period but 2.71% higher than production during corresponding period of last year. Reasons for shortfall in production are as under:
Ø  Offshore: Natural decline/increase in water cut from matured fields of Western Offshore and repair job of sub-sea lines.
Ø  Onshore: GEB power shutdowns / electrical faults due to heavy rain / flood in Mehsana and pressure decline & increase in water cut in Gandhar field affected Ankleshwar production
1.2        Crude oil production by OIL during June, 2017 was 278.71 TMT which is 2.03% lower than monthly target but 5.03% higher than production in June, 2016. Cumulative crude oil production by OIL during April-June, 2017 was 839.86 TMT which is 1.91% lower than target for the period but 5.22% higher than production during corresponding period of last year. Reasons for shortfall in production are as under:

Ø  Less than planned achievement due to higher decline in production potential of wells mainly in Greater Hapjan and Greater Chandmari areas.
Ø  Less than planned contribution from work over wells.

1.3        Crude oil production by Pvt/JVs during June, 2017 was 846.32 TMT which is 3.12% lower than the monthly target and 5.78% lower than June, 2016. Cumulative crude oil production by Pvt/JVs during April-June, 2017 was 2541.74 TMT which is 4.08% lower than target for the period and 6.23% lower than the production during corresponding period of last year. Reasons for shortfall in production are as under:

Ø  RJ-ON-90/1 (CIL): Around 100 wells are closed either due to high water cut or require WOJ and poor reservoir performance of Bhagyam. Power fluid pumps maintenance job ongoing in Mangala.
Ø  Panna-Mukta (BG): Closure of certain wells in June 2017 owing to well integrity issues and natural decline.
Ø  CY-ONN-2002/2 (ONGC): Test production from 5 oil wells. PML not yet granted.
Ø  CB-ONN-2004/2 (ONGC): Underperformance of wells

Natural Gas
2              Natural gas production during June, 2017 was 2755.48 MMSCM which is 2.75% lower than the target for the month but 6.05% higher when compared with June, 2016. Cumulative natural gas production during April-June, 2017 was 8057.72 MMSCM which is 5.55% lower than target for the period but 4.04% higher than the production during corresponding period of last year. Unit-wise and state-wise natural gas production is given at Annexure-II. Unit-wise natural gas production for the month of June, 2017 and cumulatively for the period April-June, 2017 vis-à-vis same period of last year has been shown in Table-2 and month-wise in Figure-2.
Table-2: Natural Gas Production (MMSCM)
Oil Company
Target
June (Month)
April-June (Cumulative)
2017-18 (Apr-Mar)
2017-18
2016-17
% over last year
2017-18
2016-17
% over last year
Target
Prod.*
Prod.
Target
Prod.*
Prod.
ONGC
24208.00
1943.53
1974.47
1748.60
112.92
5840.95
5728.81
5172.40
110.76
OIL
3000.00
241.45
237.36
241.25
98.39
725.26
723.52
730.71
99.02
PSC Fields
8034.00
648.33
543.65
608.55
89.33
1964.71
1605.39
1841.54
87.18
Total
35242.00
2833.32
2755.48
2598.40
106.05
8530.92
8057.72
7744.65
104.04
Note:  Totals may not tally due to rounding off.                                      *: Provisional


Figure-2: Monthly Natural Gas Production



2.1        Natural gas production by ONGC during June, 2017 was 1974.47 MMSCM which is 1.59% higher than the monthly target and 12.92% higher when compared with June, 2016. Cumulative natural gas production by ONGC during April-June, 2017 was 5728.81 MMSCM which is 1.92% lower than the cumulative target but 10.76% higher than the production during the corresponding period of the last year.

2.2        Natural gas production by OIL during June, 2017 was 237.36 MMSCM which is 1.70% lower than the monthly target and 1.61% lower than June, 2016. Cumulative natural gas production by OIL during April-June, 2017 was 723.52 MMSCM which is 0.24% lower than the cumulative target and 0.98% lower than the production during the corresponding period of last year. The major reason for shortfall in production was unplanned shutdown in BVFCL, Namrup Plant –Unit-III.

2.3        Natural gas production by Pvt/JVs during June, 2017 was 543.65 MMSCM which is 16.15% lower than the monthly target and 10.67% lower when compared with June, 2016. Cumulative natural gas production by Pvt/JVs during April-June, 2017 was 1605.39 MMSCM which is 18.29% lower than the cumulative target and 12.82% lower than the production during the corresponding period of last year. Reasons for shortfall in production are as under:

Ø  Sohagpur West (RIL): Underperformance of CBM wells. Production restrained due to maximum CBM intake limited by IFFCO to 1,80,000 SCMD at GAIL’s Phulpur terminal
Ø  Raniganj East (Essar): Few wells closed for planned maintenance and refrac jobs
Ø  AAP-ON-94/1 (HOEC): Production deferred due to delay in grant of PML.
Ø  Closure of 2 wells in D1D3 field and 1 well in MA field in KG-DWN-98/3 (RIL).
Ø  RJ-ON-90/1 (CIL): Around 100 wells are closed either due to high water cut or require WOJ and poor reservoir performance of Bhagyam. Power fluid pumps maintenance job ongoing in Mangala.
Ø  Panna-Mukta (BG): Closure of certain wells owing to well integrity.


3.        Refinery Production (in terms of crude oil processed)

Refinery production during June, 2017 was 20057.80 TMT which is 0.11% higher than the target for the month but 0.54% lower when compared with June, 2016. Cumulative production during April-June, 2017 was 60898.38 TMT which is 3.19% higher than the target for the period and 1.04% higher than the production during corresponding period of last year. Unit-wise production is given at Annexure-III. Company-wise production for the month of June, 2017 and cumulatively for the period April-June, 2017 vis-à-vis same period of last year has been shown in Table-3 and month-wise in Figure-3.

Figure 3: Monthly Refinery Production




Table 3: Refinery Production (TMT)
Oil Company
Target
June (Month)
April-June (Cumulative)
2017-18 (Apr-Mar)
2017-18
2016-17
% over last year
2017-18
2016-17
% over last year
Target
Prod.*
Prod.
Target
Prod.*
Prod.
CPSE
139090
11493.28
12083.45
11095.09
108.91
34466.45
35690.25
33802.66
105.58
IOCL
65750
5405.00
5729.44
5183.04
110.54
16741.00
17520.83
16097.65
108.84
BPCL
27000
2200.00
2243.35
2059.72
108.92
6200.00
6338.05
6202.41
102.19
HPCL
17309
1449.76
1486.17
1422.76
104.46
4296.56
4490.39
4479.04
100.25
CPCL
10300
866.10
963.88
915.08
105.33
2574.66
2588.93
2642.64
97.97
NRL
2670
219.529
234.037
232.812
100.53
665.71
704.51
687.68
102.45
MRPL
16000
1350.000
1419.243
1273.915
111.41
3975.00
4027.15
3672.27
109.66
ONGC
62
2.891
7.327
7.762
94.40
13.52
20.39
20.97
97.25
JVs
15201
922.000
586.906
1410.598
41.61
2686.00
2594.84
4426.05
58.63
BORL
6000
525.00
586.91
532.28
110.26
1575.00
1773.20
1682.37
105.40
HMEL
9201
397.00
0.00
878.32
0.00
1111.00
821.64
2743.67
29.95
Private
90480
7619.62
7387.44
7661.85
96.42
21860.66
22613.29
22044.58
102.58
RIL
70174
5941.75
5723.77
5941.75
96.33
16827.06
17487.05
16827.064
103.92
EOL
20306
1677.87
1663.67
1720.10
96.72
5033.6
5126.238
5217.512
98.25
TOTAL
244771
20034.90
20057.80
20167.55
99.46
59013.11
60898.38
60273.29
101.04
Note: 1 HMEL Refinery undergone major turnaround during Apr-Jun, 2017                        *: Provisional
          2. Totals may not tally due to rounding off.                                 


3.1         CPSE Refineries’ production during June, 2017 was 12083.45 TMT which is 5.13% higher than the target for the month and 8.91% higher than the production achieved in the corresponding month of last year. Cumulative production by CPSE refineries during April-June, 2017 was 35690.26 TMT which is 3.55% higher than the target for the period and 5.58% higher than the production during corresponding period of last year. Reasons for shortfall of refinery production in some CPSE refineries are as under:

Ø IOCL, Guwahati: Lower due to deferment shutdown of HGU, HDT & MSQ from Apr'17 to June'17.
Ø IOCL, Barauni: Lower due to BS- IV switchover (naphtha Containment).
Ø IOCL, Panipat: Marginally lower than plan due to high SRGO stocks
Ø IOCL, Gujarat: Lower Due to M&I shutdown of AU-1/AU-2/AU-4.
Ø IOCL, Haldia: Lower due to OHCU BLE issue.
Ø IOCL, Bongaigaon: Lower due to CDU-1 Idling due to low Crude Stock and High DHDT ISD due to HGU and DHDT S/D.
Ø BPCL, Mumbai:  Lower due to planned shutdown of CDU3, NHGU and Hydrocracker unit for Turnaround and revamp.
Ø HPCL, Visakh: Lower due to unplanned shutdown of primary units.
Ø CPCL, Manali & CBR: Lower than target due to CDU-3/HGU shutdown (equipment problem) in Apr'17.

3.2    Production in JV refineries during June, 2017 was 586.91 TMT which is 36.34% lower than the target for the month and 58.39% lower than the production achieved in the corresponding month of last year. Cumulative production by JVs refineries during April-June, 2017 was 2594.84 TMT which is 3.39% lower than the target for the period and 41.37% lower than the production during corresponding period of last year. The major reason for shortfall in production was major turnaround underway in HMEL refinery during April - June, 2017.
3.3    Production in private refineries during June, 2017 was 7387.44 TMT which is 3.05% lower than the target for the month and 3.58% lower when compared with June, 2016. Cumulative production by private refineries during April-June, 2017 was 22613.29 TMT which is 3.44% higher than the target for the period and 2.58% higher than the production during corresponding period of last year.
3.4    Refinery-wise details of the capacity utilization and production of petroleum products during the month of June, 2017 and cumulatively for the period April-June, 2017 vis-à-vis April-June, 2016 are given at Annexures - IV and V respectively.

No comments:

Finding funds: On COP28 and the ‘loss and damage’ fund....

A healthy loss and damage (L&D) fund, a three-decade-old demand, is a fundamental expression of climate justice. The L&D fund is a c...