We know that the main reason for Delhi Pollution says construction work vehicle emission stubble burning in Haryana and Punjab wind pattern location and dust from desert.
It is important factor that we can reduce that the construction trust extraordinary airport must be made by the developers in the applying dust control measurement specially and the project site.
India is on the Fast Track to development.
Pay scale of development and construction project around us has increased hugely in the last decade.
as a result their pollution specially caused by particulate matter has gained greater the attraction in our routine life.
being acute pollutant particulate matter pm 2. 5 and pm10 affected human health adversely.
IIT Gate oats in winter the reason for this simple at low temperature and stagnant condition environmental conditions or not favourable for pollutant to move from one place to another.
this is why we face health problem Satyajit choked throat chest congestion eye irritation and perpetual headache through the winter.
the ministry of environment forest and climate change launched the national clean air programme as a medium term strategy to tackle the air pollution problem.
the intent of NCP National ambient air quality standard and to meet this over acting gold guideline protocol will be developed to mitigate air pollution from air major contribution sector.
Finish the construction sector is one of the major pollutant Contributor in India the NCP has recommended that construction actively has to be stopped in Delhi NCR when the particulate matter 10 to particulate matter 2. 5 constructions of the 500 microgram per m3 and 300 microgram per metre cube respectively persist 48 hours or more.
recently the National green tribunal order 23 states and union territory to prepare and accent to plan combat air pollution.
the proposed Action Plan by each state needs to emphasize the identification of pollutant from all possible sources that is regular industrial dust construction garbage burning agriculture including burning of Crop Residue and indoor.
While NC National clean air programme will act as broad initiatives in the directions of air pollution mitigations at National and state level there or existing astringent regulations that have to be followed for sake of environment.
before construction project under the difference typologies and of different size comments work the developers contractors have to submit environment impact assessment report and must have in hand approve environment clearance report from the concerned government body.
construction project Aspiring to get the green building rating certification from GRIHA igbc and l e d et cetera I have to compile with the requirement of different credit criteria of the corresponding green building rating system.
the clearance is given project on the certain commitment proposal to be implemented at the time of construction activities.
The approved report act as protocol to be referred to the implemented during construction stage.
similarly the green building rating certification system clearly demonstrates at what stage which measure has to be compliant with its mitigation air pollution.
one of the requirement for the DVR system species that pride of starting excavation site must be enclosed by the minimum 3 M high building and all around the external Periphery.
the intent of the requirement is to avoid dust from the spreading out of the premises and to protect the surrounding habitat.
India's development doesn't required to the Indian construction for another decides on so which means that the health problem arising from the air pollutions will continue to impact our living in the comprising year.
to overcome this certain extent construction development project should undertake a new reading entry steps such as covering of loose fine construction material in the storage of the sun on travelling with the direction.
speaking of non potable water and providing of water through of Veet waxing at the entry and exit Gate cutting and finishing Stones in the enclosed area and resting this particular movement inside the construction site to maximize the speed of 10 km per hour.
the combat dysphoria sense all of us must be more sensitive than dynamic in the implementing the Environment protection measure the extraordinary airport must be made by the developers in applying dust control measurement dedicated at project site.
No comments:
Post a Comment